Before buying new equipment it is worth knowing what the existing train can absorb. We survey the installed plant, re-run the balance at the proposed throughput and identify the genuine bottleneck.
Key features
- Survey and rating of installed heat transfer area and utilities.
- Bottleneck identification across process, utility and hydraulic limits.
- Costed options ranked by payback rather than by equipment count.

