We supervise erection from foundation check and equipment setting through piping, insulation and instrumentation, then take the plant through flushing, hydrotest, dry runs and hot commissioning to the guarantee run.
Key features
- Pre-commissioning checks, flushing, hydrotest and vacuum tightness testing.
- Start-up sequence written for your operators, then run alongside them.
- Performance guarantee run with steam, product concentration and condensate quality recorded.